Asphalt Shingle Roof Replacement in Pittsburgh, PA.
Intro
A roof does one job, and it has to do it perfectly: keep water out. When an asphalt shingle roof reaches the end of its life, no amount of patching changes that, and every storm becomes a gamble. Shepherd and Shield Roofing replaces full asphalt shingle roofs for homeowners across the Pittsburgh, PA area and central Pennsylvania, and owner Nolan Link runs every replacement personally. We tear off the old roof down to the deck, fix what we find, and install a complete system that sheds water and holds up to Pennsylvania weather. Call (814) 312-8555 for a free, written estimate.
When it is time to replace, not repair
There is a point where repairs stop making sense, and a good contractor will tell you when you have reached it. Signs your asphalt roof is done include shingles that are curling, cupping, or losing their granules (you will see grit in the gutters), bald spots where the asphalt mat shows through, repeated leaks in different spots, daylight or staining in the attic, and a roof that is simply old. Most asphalt roofs in our climate last somewhere in the fifteen to twenty-five year range depending on the original quality and ventilation. If yours is in that window and giving you trouble, a replacement is usually cheaper over time than chasing leaks year after year. Nolan will inspect it for free and give you the honest answer, even when that answer is that you have a few good years left.
Our six-step roof system
We do not improvise. Every Shepherd and Shield roof goes down the same proven way, because a consistent process is how you get a roof that does not leak.
- Tear off the existing roof. We remove the old shingles completely down to the decking. We do not lay new shingles over old ones, because that traps heat, hides rot, and never lasts.
- Inspect the decking. With the roof open, we check every sheet of decking for soft spots, water damage, and rot, and we replace what is bad. You cannot build a good roof on a rotten deck.
- Ensure a solid nailing surface. We make sure the deck gives the fasteners something to bite, so nails hold and shingles stay put in high wind.
- Install underlayment and ice-and-water protection. We lay the underlayment and add ice-and-water shield in the valleys, along the eaves, and around penetrations, the exact places where Pennsylvania ice dams and wind-driven rain try to get in.
- Install the new shingle system. Shingles, flashing, ridge venting, and accessories go on as a complete system, with the flashing installed properly rather than just sealed with caulk.
- Clean up completely. We sweep the property for nails, haul away every scrap of the old roof, and leave your yard the way we found it.
Shingle options for your home
Architectural (dimensional) shingles are what we install on most homes, and for good reason. They are thicker than the old three-tab style, they carry better wind and impact ratings, they last longer, and they give the roof depth and a high-end look. They come in a wide range of colors so you can match or update your home. If you are weighing options, Nolan will walk you through the trade-offs in plain language, including wind ratings, warranty terms, and how a given color will look on your specific house. The goal is a roof that performs first and looks good second, in that order.
What a new roof costs and what drives the price
The honest answer is that roof price depends on your roof, which is why we never quote a real number over the phone. The biggest factors are the square footage, the pitch (a steep roof is slower and more dangerous to work, which costs more), how many old layers have to come off, the condition of the decking once we open it up, and the complexity of the roof (valleys, dormers, chimneys, and skylights all add labor). Better shingles and accessories cost more up front but often come with stronger warranties. After Nolan inspects the roof, you get a clear written estimate that spells out what is included, so there are no surprises and no padding. A written estimate after an inspection is worth far more than a cheap phone quote that balloons once the crew shows up.
Built for Pennsylvania conditions
Our roofs are designed for the weather they actually face. Freeze-thaw cycles loosen fasteners and crack brittle materials over the winter. Ice dams form at the eaves when attic heat melts snow that refreezes at the cold edge, then backs water up under the shingles. Heavy snow sits on the roof for weeks at a time. Summer brings fast, hard thunderstorms with wind-driven rain. We answer those conditions with proper ice-and-water shield placement, correct ventilation so the attic stays cold and ice dams do not form, and wind-rated shingles fastened to a solid deck. A roof that ignores our climate is a roof that fails early.
Storm and insurance work
If a storm has damaged your roof, you may have a claim. We can inspect the roof, document the damage with photos, and give you a clear assessment of what we find so you have real information when you talk to your insurer. We are straight about this too: not every worn roof is a covered claim, and we will tell you honestly whether what we see looks like storm damage or normal age. Either way, you will know where you stand.
Why homeowners trust Shepherd and Shield
You are dealing with the owner the entire time. Nolan inspects your roof, writes your estimate, runs the job, and answers your calls. We are licensed and insured, we follow the same six-step process on every roof, and we clean up like the job mattered, because it does. We would rather earn a customer for life than win one job and move on.
Related services
A roof works with the rest of your exterior. While we are out, ask Nolan about gutter replacement to handle the water once it leaves the roof, and fascia replacement and soffit replacement along the roofline. If your walls need attention too, see vinyl siding replacement.
Areas we serve
We replace roofs across Cambria County, Blair County, and Westmoreland County.
CTA
Get a free, written estimate from the owner. Call Nolan at (814) 312-8555 or request your estimate online.
Frequently asked questions
How long does an asphalt shingle roof replacement take?
Most homes are torn off and re-roofed in one to two days, depending on the size of the roof, the pitch, the weather, and what we find in the decking. Nolan gives you a realistic timeline with your written estimate.
Can you put new shingles over my old roof?
We do not. Laying new shingles over old ones traps heat, hides rotten decking, and shortens the life of the new roof. We always tear off down to the deck so the new roof is built on a sound, inspected surface.
How long does a new asphalt roof last?
In our climate, a quality architectural shingle roof generally lasts in the twenty to thirty year range when it is installed correctly and the attic is properly ventilated. Good installation and ventilation matter as much as the shingle itself.
Do you replace bad decking, and does that cost extra?
Yes. Once the old roof is off, we inspect the decking and replace any that is soft, rotted, or water-damaged. Decking replacement is priced separately because we cannot know how much is bad until the roof is open, and we will show you what we found.
Is Shepherd and Shield licensed and insured for roof replacement?
Yes, we are licensed and insured, and we will provide proof before the job begins so you are protected throughout the work.